Skip to content
TSINGHUGet a quote

KNOWLEDGE DB

Last updated

Knowledge DB

9 entries

FAQIs TSINGHU a laboratory or a testing and certification agency?An agency and digital compliance service provider; it does not issue reports or certificates in its own name.FAQWhich certifications does a storage battery need to be exported to the EU?The battery regulation, EMC and Low Voltage directives under CE marking, plus IEC safety testing and UN 38.3.FAQHow long does new-energy product certification usually take?Typical ranges when samples and documents are complete, varying by product and market.FAQHow do I verify a report or certificate?Enter the number to see the issuing body, standards, validity and status; batch verification is available through the API.Regulation analysisEU battery regulation: the six datasets to prepare nowObligations and timelines for carbon footprint, recycled content, due diligence, battery passport, labelling and the CE declaration.Access guidePortable power stations to North America: the shortest path through UL 2743 and FCCSample counts, test sequence and common failures, plus covering multiple platform requirements in one submission.Access guideLocal testing essentials for Brazilian INMETRO lithium battery certificationDesignated bodies, local sampling, arranging the importer as applicant, and lead-time expectations.Regulation analysisIndian BIS: four things to confirm before applyingWhether the product is in the compulsory scope, the standard edition, local testing arrangements and the AIR requirement.Access guidePlanning conversion into eight markets from a single CB reportMulti-market access planning around a CB report, identifying national differences to cut cost.
Access guidePublished

Portable power stations to North America: the shortest path through UL 2743 and FCC

Sample counts, test sequence and common failures, plus covering multiple platform requirements in one submission.

Complete the cell-level UL 1642 or IEC 62133 assessment first, then move to UL 2743 whole-unit testing — this avoids repeated testing. FCC Part 15 and safety testing can be submitted in parallel. Common failures cluster around protection loss after drop, charging temperature rise beyond limits, and incomplete marking. If you are also listing on Amazon, the platform compliance document pack can be produced in the same test round.

See related regulations

Related certification marks

Last verified
2026-08-19
Version
v1
Official source
View source