Energy Storage PCS

Testing

Energy Storage PCS

Bidirectional converters for C&I and utility storage, up to 2.5 MW.

2.5MWConverter test power
10mSemi-anechoic chamber
10Test items
19Standards

Energy Storage PCS

Test items

  • Electrical performance
  • Grid connection
  • Fault ride-through
  • Power quality
  • Efficiency
  • Electrical safety
  • EMC
  • Environmental & reliability
  • HIL simulation
  • Temperature rise

China · Standards

  • GB/T 34120-2023
  • GB/T 34133-2023
  • GB/T 36547-2024
  • GB/T 36548-2024

Europe · Standards

  • EN IEC 62477-1
  • EN IEC 61000-6-2/-4
  • EN 50549-1/-2
  • EN 50549-10
  • VDE-AR-N 4105
  • VDE-AR-N 4110

North America · Standards

  • UL 1741
  • UL 9540
  • IEEE 1547-2018
  • IEEE 1547.1-2020

Australia · Standards

  • AS/NZS 4777.2:2020+A2:2024

International · Standards

  • IEC 62477-1
  • IEC 62909-1
  • IEC 62933-5-2
  • IEC 61000-6-2/-4
Energy Storage PCS

Key figures

0MW

Converter test power

0m

Semi-anechoic chamber

Process

From sample to certificate

  1. 01 Requirements
  2. 02 Plan & quote
  3. 03 Samples
  4. 04 Testing
  5. 05 Report
  6. 06 Certificate

Free resources

Take the guide with you

A PDF guide from our engineers — the route, the tests and the deadlines in one place.

Downloads →

GuidePDF · 5 pages · Edition 2026-10

Energy storage systems: the certification roadmap for China, the EU and North America

GB 44240, IEC 62619, UL 9540 / 9540A, the EU Battery Regulation and grid codes — which evidence a storage system needs in each market, and how to plan one test campaign for all three.

White paperPDF · 4 pages · Edition 2026-10

UL 9540A after the 6th edition: fire testing for battery energy storage

From cell to installation, and now large-scale fire testing: what the 5th (2025) and 6th (2026) editions of UL 9540A change, how NFPA 855-2026 uses the results, and how to plan a test programme that survives the new rules.

Get the PDF

Leave your details to download. Our other resources then unlock on this device.

We use your details only to send resources and discuss your testing needs. We never pass them on.

FAQ

What power level can be tested?

Power conversion systems up to 2.5 MW, including grid-forming and grid-following modes.

Which certifications follow the tests?

CQC, CB (IEC 62477-1), CE and grid-code certificates for target markets.

Tell us the product and the target market.

You get a test plan, timeline and quote within one working day.