  • 01Safety: IEC 62040-1:2017 with amendments 1 (2021) and 2 (2022); in China GB/T 7260.1-2023.
  • 02EMC: IEC 62040-2:2016; in China GB/T 7260.2-2026, in force since 1 October 2026 and replacing the 2009 edition.
  • 03Performance: IEC 62040-3:2021; in China GB/T 7260.3-2024. Minimum efficiency values in Annex I are now normative.
  • 04IEC 62040-4 (environmental aspects) was withdrawn on 13 January 2026. China’s GB/T 7260.40-2020 is still current.
  • 05Network and communication ports now have EMC limits, so ship samples with the cards customers will use.

Which standards apply

PartIEC (current)ChinaStatus in China
1 — SafetyIEC 62040-1:2017 + AMD1:2021 + AMD2:2022GB/T 7260.1-2023In force since 1 July 2024; identical adoption
2 — EMCIEC 62040-2:2016GB/T 7260.2-2026Published 31 March 2026, in force since 1 October 2026; modified adoption; replaces GB/T 7260.2-2009
3 — PerformanceIEC 62040-3:2021GB/T 7260.3-2024In force since 1 January 2025; modified adoption
4 — EnvironmentIEC 62040-4:2013, withdrawn 13 January 2026GB/T 7260.40-2020Still current
5-3 — DC output UPSIEC 62040-5-3:2016GB/T 7260.503-2020Current

In the EU, UPS are assessed against EN IEC 62040-1 under the Low Voltage Directive and EN IEC 62040-2 under the EMC Directive. In the US, UPS are listed to UL 1778. For safety, an IECEE CB test report to IEC 62040-1 is the usual base for other markets.

What changes with GB/T 7260.2-2026

The 2009 edition followed IEC 62040-2:2005. The 2026 edition is a modified adoption of IEC 62040-2:2016, so China now follows the IEC changes of that edition:

  • Network port limits added to the emission tables and Annex C. SNMP cards, Ethernet and other wired communication ports are now measured.
  • Category C3 quasi-peak limit changed, for consistency with other standards.
  • Immunity performance criteria clarified in Table 4.
  • Test configurations in Annex A revised.

Because the national text is a modified adoption, check its differences from the IEC text before planning tests.

What changes in performance testing

IEC 62040-3:2021 and its Chinese counterpart GB/T 7260.3-2024 bring the following changes:

  • Efficiency becomes pass/fail. Minimum efficiency values in Annex I are normative, based on active output power rating and weighting factors.
  • Classification code shortened from 8 to 7 characters.
  • Non-linear step load is no longer a type test.
  • New requirements for UPS with multiple normal modes.
  • Non-linear load requirements in Annex E relaxed.
  • Environmental conditions aligned with IEC 62040-1; free-fall test aligned with ISO 4180.

Measure efficiency at partial loads early in development. A design that only reaches its figures at full load may now fail.

Before you go to the lab

  • Model family: choose the highest rating of each topology as the representative sample, and list all variants with their differences.
  • Batteries: IEC 62040-2 covers UPS that include an energy storage device. Test with the batteries or battery cabinet used in service, and bring their data sheets.
  • Communication cards: fit the network, SNMP and RS-485 cards as shipped, with representative cables, because these ports are tested.
  • EMC category: state the category you claim and the user instructions that go with it.
  • Documents: circuit diagrams, a list of critical components with their certificates, the user manual with warnings, label artwork, the declared classification code and efficiency values.
  • Order of work: safety construction review first, an EMC pre-scan next, full performance tests last. Design changes after the performance run are the most expensive.

FAQ

When did GB/T 7260.2-2026 take effect?

On 1 October 2026. It was published on 31 March 2026 and fully replaces GB/T 7260.2-2009. It is a modified adoption of IEC 62040-2:2016.

Can I still refer to IEC 62040-4?

The IEC withdrew IEC 62040-4:2013 on 13 January 2026. In China, GB/T 7260.40-2020 on environmental requirements remains current.

Can one test programme cover several markets?

Largely. A CB report to IEC 62040-1 supports safety approvals; EMC and performance reports to IEC 62040-2/-3 can be reused, but check national differences such as the modified GB editions.

Sources

  1. IEC webstore: IEC 62040-1:2017/AMD2:2022 (UPS safety)
  2. IEC webstore: IEC 62040-2:2016 (UPS EMC) and its technical changes
  3. IEC webstore: IEC 62040-3:2021 (UPS performance) and its technical changes
  4. IEC webstore: IEC 62040-4:2013, withdrawn 2026-01-13
  5. National standards full-text system: GB/T 7260 series status
  6. National standard plan: GB/T 7260.2-2026 (modified adoption of IEC 62040-2:2016)

Tell us the product and the target market.

You get a test plan, timeline and quote within one working day.

Get the PDF

Leave your details to download. Our other resources then unlock on this device.

We use your details only to send resources and discuss your testing needs. We never pass them on.