Downloads

Certification checklists and test-preparation guides from our engineers — free PDF downloads.

12PDF11languages

  1. ChecklistPDF · 7 pages · Edition 2026-10

    China CCC for EV chargers: the document checklist

    Everything to prepare for CCC certification of AC and DC EV supply equipment — application file, units, samples, factory inspection and surveillance.

    • The application file, document by document
    • Unit splitting and sample rules for AC and DC
    • Routine and confirmation tests for the factory inspection
  2. ChecklistPDF · 6 pages · Edition 2026-10

    Exporting EV chargers to the EU: the compliance checklist

    CE marking, technical file, product markings, cybersecurity (RED and CRA) and AFIR features — what a charger needs before it ships to Europe.

    • Which EU acts apply, and when
    • Technical file and product marking, item by item
    • Cybersecurity, AFIR features and the test plan
  3. ChecklistPDF · 5 pages · Edition 2026-10

    EV charger EMC testing: the preparation checklist

    What to decide, bring and fix before the chamber booking — standards, operating modes, loads, monitoring, performance criteria and design checks.

    • Which EMC standard for which market
    • Modes, load, monitoring and pass criteria to agree first
    • What to bring to the lab, and design checks that save a retest
  4. ChecklistPDF · 4 pages · Edition 2026-10

    China EV type approval: the battery, high-voltage and EMC checklist

    GB 38031-2025, GB 18384-2025 and GB 34660-2026 — the new mandatory tests for traction batteries, vehicle high-voltage safety and EMC, with dates and a preparation list.

    • Dates for new and existing vehicle types
    • Battery tests: no fire after thermal runaway, bottom impact, fast-charge safety
    • Vehicle high-voltage and EMC items to prepare
  5. GuidePDF · 5 pages · Edition 2026-10

    Energy storage systems: the certification roadmap for China, the EU and North America

    GB 44240, IEC 62619, UL 9540 / 9540A, the EU Battery Regulation and grid codes — which evidence a storage system needs in each market, and how to plan one test campaign for all three.

    • Requirements by market and by level: cell, pack, system, PCS
    • Fire and propagation tests that decide the design
    • Battery Regulation dates and a combined test plan
  6. GuidePDF · 5 pages · Edition 2026-10

    Germany grid-connection certification for PV inverters and storage

    VDE-AR-N 4105:2026, unit and NA-protection certificates, ZEREZ registration and the 2028 deadline — the route from a product to a grid-approved product in Germany.

    • Which rule applies — 4105, 4110 or the 800 VA path
    • The technical requirements that change firmware
    • Certification steps, documents and deadlines
  7. GuidePDF · 4 pages · Edition 2026-10

    Variable-speed drives: the EMC and safety certification guide (IEC 61800)

    IEC 61800-3 EMC categories, IEC 61800-5-1 safety, functional safety, EU ecodesign IE2 and the Chinese GB/T 12668 series — how to certify a drive for Europe, China and CB markets in one campaign.

    • Which parts of IEC 61800 apply, and the latest editions
    • EMC categories C1–C4 and what they mean for filters and manuals
    • EU CE, ecodesign IE2 and the test plan
  8. GuidePDF · 4 pages · Edition 2026-10

    EV charger communication: OCPP and ISO 15118 interoperability and certification

    OCPP 1.6, 2.0.1 and 2.1, the OCA certification programme, ISO 15118 and Plug & Charge, and the AFIR deadlines — how to prove a charger talks correctly to back ends and vehicles.

    • Which OCPP version to build on, and how certification works
    • ISO 15118-2, -20 and Plug & Charge in practice
    • A test plan from conformance to field interoperability
  9. ChecklistPDF · 4 pages · Edition 2026-10

    Rolling-stock electronics: the EN 50155 test and documentation checklist

    EN 50155:2021 with EN 50121-3-2 EMC, EN 61373 shock and vibration and EN 45545-2 fire — the tests, classes and documents onboard electronic equipment needs for railway projects.

    • The standards a rail customer will cite
    • Classes to fix before testing: temperature, interruptions, mounting
    • Type tests, routine tests and the documentation set
  10. White paperPDF · 4 pages · Edition 2026-10

    UL 9540A after the 6th edition: fire testing for battery energy storage

    From cell to installation, and now large-scale fire testing: what the 5th (2025) and 6th (2026) editions of UL 9540A change, how NFPA 855-2026 uses the results, and how to plan a test programme that survives the new rules.

    • How UL 9540A works, level by level
    • What changed in 2025 and with large-scale fire testing in 2026
    • Planning samples, data and designs for the new edition
  11. ChecklistPDF · 5 pages · Edition 2026-10

    Exporting UPS to the EU: the CE checklist

    EN IEC 62040-1 and -2, RoHS, the Battery Regulation and the Cyber Resilience Act — what an uninterruptible power supply needs before it ships to Europe.

    • Which EU acts and standards apply to a UPS
    • Technical file, markings and battery obligations
    • Test preparation: samples, cards, EMC category
  12. GuidePDF · 4 pages · Edition 2026-10

    US grid interconnection for inverters and storage: UL 1741 SB and IEEE 1547

    IEEE 1547-2018, the IEEE 1547.1-2020 tests, UL 1741 Supplement SB listings, California Rule 21 and IEEE 2030.5 communication — what an inverter or PCS needs to connect to US grids.

    • How IEEE 1547, IEEE 1547.1 and UL 1741 SB fit together
    • The grid-support functions that are tested
    • California’s SB + CSIP rule and the certification steps

Tell us the product and the target market.

You get a test plan, timeline and quote within one working day.

Get the PDF

Leave your details to download. Our other resources then unlock on this device.

We use your details only to send resources and discuss your testing needs. We never pass them on.